date generated (P453): Difference between revisions
Jump to navigation
Jump to search
Superraptor (talk | contribs) (Created claim: subproperty of (P18): start time (P44)) |
Superraptor (talk | contribs) (Created claim: property constraint (P5): subject type constraint (Q20239)) |
||
(One intermediate revision by the same user not shown) | |||
description / en | description / en | ||
The date that an entity's production as the result of an activity was completed. | |||
Property / property constraint | |||
Property / property constraint: subject type constraint / rank | |||
Normal rank | |||
Property / property constraint: subject type constraint / qualifier | |||
Property / property constraint: subject type constraint / qualifier | |||
Property / property constraint: subject type constraint / qualifier | |||
Latest revision as of 18:33, 14 May 2024
The date that an entity's production as the result of an activity was completed.
- generation date
- generated at time
- time of generation
- date of generation
- generation time
Language | Label | Description | Also known as |
---|---|---|---|
English | date generated |
The date that an entity's production as the result of an activity was completed. |
|
Data type
Point in time
Statements
0 references
0 references